HW

VLSI & Digital Design Interview Cheat Sheet

1. Power Consumption (The "Power Wall")

  • Why it matters: Power limits how fast we can run the CPU (heat) and battery life.
  • Dynamic Power (Active): Energy used when transistors switch (0 → 1).
    • $P = \alpha \cdot C \cdot V^2 \cdot f$
    • $\alpha$: Activity Factor (How often it switches).
    • $C$: Capacitance (Load).
    • $V$: Voltage (The biggest factor because it is squared).
    • $f$: Frequency (Speed).
    • How to save: Clock Gating (turn off clocks for idle blocks) or DVFS (Dynamic Voltage and Frequency Scaling).
  • Static Power (Leakage): Energy leaked even when the CPU is doing nothing.
    • Cause: Transistors are getting tiny (7nm, 3nm) and don't turn off completely.
    • How to save: Power Gating (cut off the power supply entirely).

2. Timing & Frequency (The Speed Limit)

Setup Time

  • Minimum time data must be stable BEFORE the clock edge
  • Checks if current data arrives early enough at Capture FF
  • Check: Data Arrival Time ≤ Data Required Time (Clock Arrival Time - Setup Time) (at Capture FF)
  • Slack: Data Required Time - Data Arrival Time (positive = pass, negative = violation)
  • Why violation happens?
    • Long combinational delay
    • Large clock skew (negative)
    • High clock uncertainty
    • Slow input arrival time
  • Violation: Data arrives too late → FF tries to capture while data is still changing → captures corrupted/wrong value → chip computes incorrect results
  • Fix: Make path faster
    • Upsize cells = use bigger/stronger gates (drive faster)
    • Shorten wires = improve placement to reduce wire delay
    • Lower Vt = use faster transistors (but consume more power)
    • Slow clock = increase clock period (reduce frequency)
    • Pipeline design (add registers) = break long path into multiple cycles (architectural change)

Hold Time

  • Minimum time data must be stable AFTER the clock edge
  • Checks if next data arrives too quickly at Capture FF
  • Check: Data Arrival Time ≥ Data Required Time (Clock Arrival Time + Hold Time) (next data at Capture FF)
  • Slack: Data Arrival Time - Data Required Time (positive = pass, negative = violation)
  • Why violation happens?
    • Path too fast (short delay)
    • Large positive clock skew
    • Clock tree imbalance
  • Violation: Next data arrives too fast → FF hasn't finished latching current data yet → accidentally captures the new data instead of the intended old data → wrong value stored and propagates through circuit
  • Fix: Make path slower
    • Add delay buffers = insert buffers to slow down signal
    • Downsize cells = use smaller/weaker gates (slower)
    • Useful skew = adjust clock arrival timing
  • Key difference: Cannot fix by changing clock frequency (frequency-independent)

Slack

  • Slack = Required Time - Arrival Time (for Setup, most common)
  • Positive slack = pass ✓, Negative slack = violation ✗
  • Hold slack uses opposite sign: Arrival Time - Required Time

Critical Path

  • Path with the worst slack (most negative or least positive)
  • Setup critical path: Longest delay path → limits max frequency
  • Hold critical path: Shortest delay path → may cause hold violations
  • Max Frequency = 1 / (Critical Path Delay + Setup Time + Clock Uncertainty)

Clock Skew

  • Difference in arrival time of clock signal at different registers
  • Positive skew: Launching clock arrives before capturing clock
  • Negative skew: Capturing clock arrives before launching clock

3. CMOS Fundamentals (The Physics)

  • Inverter: The basic building block.
    • PMOS (Top): Pulls up to 1 (Good at passing 1s).
    • NMOS (Bottom): Pulls down to 0 (Good at passing 0s).
  • RC Delay: Wires have Resistance (R) and Gates have Capacitance (C). Charging them takes time. In modern chips, Wire Delay is often worse than Logic Delay.

4. Verilog Basics (For Reading Code)

  • Modules: The building blocks (like Classes in C++).
  • Blocking Assignment (=):
    • Executes line-by-line (Sequential).
    • Used for Combinational Logic (AND, OR, MUX).
  • Non-Blocking Assignment (<=):
    • Executes all at once (Parallel) at the clock edge.
    • Used for Sequential Logic (Flip-Flops/Registers).
  • Common Hardware Patterns:
    • if/else or case → becomes a Multiplexer (MUX).
    • always @(posedge clk) → becomes a Flip-Flop.

5. System Design Q&A (Connecting to Architecture)

  • Q: How do we make a CPU faster?
    • A: Deepen the pipeline (split the Critical Path into smaller chunks) to increase frequency. Trade-off: Higher power and higher penalty for branch misprediction.
  • Q: Why don't we just increase voltage to run faster?
    • A: Because Power = $V^2$. A small increase in speed causes a huge increase in heat/power.